The brief was to remove two temporary classrooms from an open courtyard, then design and build a two-storey, 24-bay modular classroom block.
View MoreThurston was commissioned to design, manufacture and install units to a bespoke specification, from pre-designed layouts for 32 two bed homes.
View MoreThe brief was to construct a three-story student accommodation facility.
View MoreBack in 2016 Thurston Group manufactured a “SureSpan” Modular 2 bay building, for Arrow Cars at Bristol Airport. This design and build contract and was completed in less than a month.
View MoreThurston Group were appointed to Design, manufacture and deliver an Anti-vandal Security Gatehouse for Cargill, Thirsk.
View MoreModular buildings meet the demand for schools that need to be built in a short period of time, and this certainly is the case for the Langford Academy.
View MoreLayher UK having seen a growing demand for its products across the Central region, required a new depot facility building that provided office and welfare space.
View MoreThurston Group was chosen by Dyer & Butler as their principal offsite construction partner. This £2.50m, project involved the design, manufacture and installation of a Surespan volumetric building.
View MoreThurston Group contract with Aldi included designing, manufacturing, and installing a single bay gatehouse at its site at Neston.
View More