Coming Soon!

Good things take time—stay tuned, new case study content is on the way!

View More

St Cecelia’s Church of England School

The brief was to remove two temporary classrooms from an open courtyard, then design and build a two-storey, 24-bay modular classroom block.

View More

Hugg Homes, Cheshunt

Thurston was commissioned to design, manufacture and install units to a bespoke specification, from pre-designed layouts for 32 two bed homes.

View More

Aberystwyth University

The brief was to construct a three-story student accommodation facility.

View More

Taxi Booking Office, Bristol Airport

Back in 2016 Thurston Group manufactured a “SureSpan” Modular 2 bay building, for Arrow Cars at Bristol Airport. This design and build contract and was completed in less than a month.

View More

Security Gatehouse, Thirsk

Thurston Group were appointed to Design, manufacture and deliver an Anti-vandal Security Gatehouse for Cargill, Thirsk.

View More

Central Bedfordshire, Langford Academy

Modular buildings meet the demand for schools that need to be built in a short period of time, and this certainly is the case for the Langford Academy.

View More

LAYHER UK, Depot Facility

Layher UK having seen a growing demand for its products across the Central region, required a new depot facility building that provided office and welfare space.

View More

Cockfosters Train Crew Accommodation

Thurston Group was chosen by Dyer & Butler as their principal offsite construction partner. This £2.50m, project involved the design, manufacture and installation of a Surespan volumetric building.

View More

Aldi, Neston

Thurston Group contract with Aldi included designing, manufacturing, and installing a single bay gatehouse at its site at Neston.

View More