Aldi, Neston

Cheshire, Commercial & Industrial, Projects

Contract type: JCT 2011 design and build

Procurement route: Unspecified

GIFA: 43m2

Timescale: 12 Weeks

The brief

The contract included the design, manufacture and installation of a single bay gatehouse at Aldi’s distribution site in Neston.

The challenges

Thurston had to work within strict timelines, whilst ensuring quality and durability.

The solution

Thurston worked closely with the client to deliver the gatehouse, which comprised of a control room, a lobby, a plant room, disabled WC, driver WC, beverage area, and a cleaner store.

The manufacturing process involved using non-combustible, zinc-rich, self-healing, galvanised steel to the roof, walls and floors, which provided a high-quality finish built to last.

Unavailable

Thurston Group was approached the private school, Colfe’s, to deliver a 4 new modular classrooms during 2022.


The brief was to remove two temporary classrooms from an open courtyard, then design and build a two-storey, 24-bay modular classroom block.