St Cecilia’s Church of England School

3 min read | Matt Goff | August 2024

On behalf of Kier Construction, and as part of the SCAPE Better building school Initiative.

Thurston provided a new Two storey, Modular Classroom block that tied into the existing school buildings on the campus.

As the major part of this campus upgrade project, Volumetric Modular was chosen to minimise on-site risks whilst achieving an advanced delivery programme.

Our precision manufacturing method allowed the building to be manufacturing in a controlled setting off-site, greatly reducing dust or contamination levels on site.

Features:

  • BREEAM “Excellent”
  • Two-Storey
  • 3 ICT Suites
  • Fully Equipped Science Laboratory
  • 7 Classrooms
  • Rooftop PV Array
  • The brief was to remove two temporary classrooms from an open courtyard, then design and build a two-storey, 24-bay modular classroom block.


    Thurston was commissioned to design, manufacture and install units to a bespoke specification, from pre-designed layouts for 32 two bed homes.