St Cecilia’s Church of England School

3 min read | Matt Goff | August 2024

On behalf of Kier Construction, and as part of the SCAPE Better building school Initiative.

Thurston provided a new Two storey, Modular Classroom block that tied into the existing school buildings on the campus.

As the major part of this campus upgrade project, Volumetric Modular was chosen to minimise on-site risks whilst achieving an advanced delivery programme.

Our precision manufacturing method allowed the building to be manufacturing in a controlled setting off-site, greatly reducing dust or contamination levels on site.

Features:

  • BREEAM “Excellent”
  • Two-Storey
  • 3 ICT Suites
  • Fully Equipped Science Laboratory
  • 7 Classrooms
  • Rooftop PV Array
  • Due to the high-demand for sixth-form places at Foxford School and Community Arts Centre in the Longford area of Coventry, four new teaching spaces were required to accommodate an additional 120 students and six new staff members.


    Good things take time—stay tuned, new case study content is on the way!