Hugg Homes, Southampton
Hugg Homes.
Southampton, Residential, Projects
About the project
Contract type: Not specified
Procurement route: Not specified
GIFA: 44.7m2 each
Timescale: 12 weeks
The brief
Thurston was commissioned to design, manufacture and install one, two and three bed bespoke modular homes for Hugg Homes, Southampton.
The challenges
The biggest challenge was flood risk management, as the build involved regenerating a former waste depot.
The solution
The homes are complete with fitted kitchens, shower rooms and fitted wardrobes, with a marine painted finish externally. In order to support the immediate need for housing in the area, the homes will be in place for five years, although a BBA certificate provides additional assurance to the client that the homes have a minimum design life of 60 years.
The homes were completed offsite then delivered and craned into place, with deliveries staggered to maximise the efficiency of the crane. Once in position, services were plugged in and pipework was connected to existing outlets, and the homes were ready to be moved into almost straight away.
Read our Other Recent Case Studies
Coming Soon!
Good things take time—stay tuned, new case study content is on the way!
3 min read | Matt Goff
St Cecelia’s Church of England School
The brief was to remove two temporary classrooms from an open courtyard, then design and build a two-storey, 24-bay modular classroom block.
3 min read | Matt Goff