News and Insights

Esso – Blast Office and Welfare Complex

Contract type: Unspecified

Procurement route: Unspecified

GIFA: 324m2

Timescale: 6 weeks

The brief

Thurston was briefed to design, manufacture, and install a blast-resistant welfare building with various rooms and specific safety requirements.

The challenges

Disruption needed to be minimal due to the site being live and operational. There were also specific blast-resistance requirements that needed to be met.

The solution

Liaising with an external civil contractor, Thurston manufactured a series of blast units for the client, ultimately forming a blast-resistant complex including a reception and welfare block.

The complex, complete with air conditioning, also features a large open-plan office space, meeting rooms, a kitchenette, and three smaller offices.

Offsite construction allowed Thurston to keep disruption to a minimum. The project was delivered to Esso on time, within budget, and to a high standard.

All buildings were designed to withstand up to 100mbar blast resistance.

Discuss your next project with Thurston

Whether you're exploring options for permanent or semi-permanent, our team is ready to help solve your challenge.