Aldi, Neston
Aldi
Cheshire, Commercial & Industrial, Projects
About the project
Contract type: JCT 2011 design and build
Procurement route: Unspecified
GIFA: 43m2
Timescale: 12 Weeks
The brief
The contract included the design, manufacture and installation of a single bay gatehouse at Aldi’s distribution site in Neston.
The challenges
Thurston had to work within strict timelines, whilst ensuring quality and durability.
The solution
Thurston worked closely with the client to deliver the gatehouse, which comprised of a control room, a lobby, a plant room, disabled WC, driver WC, beverage area, and a cleaner store.
The manufacturing process involved using non-combustible, zinc-rich, self-healing, galvanised steel to the roof, walls and floors, which provided a high-quality finish built to last.
Customer testimonial
Unavailable
Read our Other Recent Case Studies
Coming Soon!
Good things take time—stay tuned, new case study content is on the way!
3 min read | Matt Goff
St Cecelia’s Church of England School
The brief was to remove two temporary classrooms from an open courtyard, then design and build a two-storey, 24-bay modular classroom block.
3 min read | Matt Goff