Affordable Modular Housing in Chelmsford
Chelmsford City Council.
Chelmsford, Residential, Projects
About the project
Contract type: Principal Contractor
Procurement route: Unspecified
GIFA: 5,217 m²
Timescale: 44 weeks
Product line: SureSpan
The brief
Thurston was commissioned to deliver 18 bespoke modular homes across two sites for Chelmsford City Council, on behalf of Pick Everard.
The challenges
Due to increased housing demand in the area, speed was vital.
The solution
As project delivery needed to be quick, offsite manufacturing was a key factor in increasing the speed of the delivery, with the advantage that homes were also ready to move into soon after being placed on site.
Each of the two sites comprises a mix of one and two bedroom homes, all with fitted bathrooms, fitted kitchens and living rooms. Fitted wardrobes, and mixed paint and cladding external finishes also came with the homes.
Thurston was chosen for this project partly because of the firm’s Surespan product. Thurston’s Surespan volumetric homes are constructed in a factory-controlled environment, ensuring high standards of quality control with minimum exposure to weather. They’re manufactured as transportable modules and ready to be delivered to site as completed homes. Each unit is designed as a “box”, linking together to form an entire building.
Customer testimonial
Read our Other Recent Case Studies
Coming Soon!
Good things take time—stay tuned, new case study content is on the way!
3 min read | Matt Goff
St Cecelia’s Church of England School
The brief was to remove two temporary classrooms from an open courtyard, then design and build a two-storey, 24-bay modular classroom block.
3 min read | Matt Goff