West Middlesex University Hospital

A fully equipped urgent care centre delivered around a live A&E department.

Application: Healthcare Facilities

Project Overview

Client:

West Middlesex University Hospital

Location:

West London

Sector: 

Heathcare & Life Sciences

Solution:

Permanent Buildings

Application:

Healthcare Facilities

Scope:

Installation of a ten-bay Urgent Care Centre, including groundworks and integration with the existing hospital building

Requirement

Urgent care centre | Live hospital | Turnkey healthcare building | Clinical fit-out | Hospital integration

West Middlesex University Hospital required additional urgent-care capacity connected directly to its existing estate — without interrupting a fully functioning hospital and A&E department.

Thurston delivered a £2.41m turnkey package covering the design, manufacture and installation of a ten-bay Urgent Care Centre, including groundworks and integration with the existing hospital building. West Middlesex Hospital

The Challenge

Healthcare buildings need to work around clinical activity that cannot simply stop while construction takes place.

At West Middlesex, installation was carried out while the wider hospital — including A&E — remained fully functional.

The new facility also needed to connect with the existing hospital and be capable of operating as a complete clinical environment rather than an empty building shell.

The solution

Thurston's turnkey scope extended from building design and manufacture into fit-out and clinical readiness.

The facility incorporated treatment rooms and triage areas equipped with medical equipment, counselling rooms, nurses' stations, reception accommodation, staff and patient WCs and accessible facilities. West Middlesex Hospital

Working around the live hospital meant installation had to be closely coordinated with the client to minimise impact on existing services.

The result

The completed Urgent Care Centre provided a fully functional new healthcare facility integrated directly with West Middlesex University Hospital.

It demonstrates the difference between simply supplying modular floor space and delivering an operational healthcare environment: clinical layout, equipment, accessibility and integration all formed part of the finished solution.

What this demonstrates

Turnkey healthcare capability

Design, manufacture, groundworks, installation and internal clinical requirements were delivered as one package.

Urgent-care environments

Treatment, triage, counselling and nurse facilities were integrated around real clinical workflows.

Live-hospital delivery

The wider hospital and A&E department continued operating throughout installation.

Existing-estate integration

The new ten-bay facility was connected directly to the hospital rather than operating as an isolated building.

Discuss your next project with Thurston

Tell us about your operational needs, site requirements and delivery challenges. Our team will help you develop a modular building solution designed around your project.